Manjung 4 - 1 X 1000MW Coal Fired Power Plant - Turbine Hall Structure

Year: 2012

Scope of Work: Shop drawings, Supply, Fabrication, Painting, and Erection of Structural Steel for Turbine Building.

Main Contractor: Mudajaya Corporation Berhad

Quantity: 3300 tonnes

BACK